Home Page

 

 


Your Energy submitted a planning application to South Cambridgeshire District Council on the 10/08/2004.

Proposal: Wind Farm Comprising 16 Wind Turbines (100 metre high), Anemometry Mast, Substation and Associated Infrastructure.
Scale of turbines

Model of the proposed turbine

Where: Land South West of Huntingdon Road (A14) In the parishes of Boxworth and Conington, covering 2km. Map

For: Cambridge Wind Farm Ltd.

Ref: S/1663/04/F

To view the plans: Your Energy have submitted a full Planning Application, which is a large technical document. They have also submitted an Environmental Statement, which constitutes as a non technical summary. This survey can be accessed by double clicking on the link below.

The file is a pdf file of 2.2Mb and will take several minutes to download. This also requires a copy of Adobe Reader to display.Click here to download a copy of Adobe Reader. You are advised to save the Environmental Survey file to your hard drive for viewing off-line.

Full plans can be viewed at either Bar Hill or Swavesey Libraries.

They can also be viewed at:

South Cambridgeshire Hall
Cambourne Business Park
Cambourne
CB3 6EA

Between 10.00am and 4.30pm weekdays.