Your
Energy submitted a planning application to South Cambridgeshire
District Council on the 10/08/2004.
Proposal:
Wind
Farm Comprising 16 Wind Turbines (100 metre high), Anemometry Mast,
Substation and Associated Infrastructure.
Scale of turbines
Model
of the proposed turbine
Where:
Land
South West of Huntingdon Road (A14) In the parishes of Boxworth
and Conington, covering 2km. Map
For:
Cambridge Wind Farm Ltd.
Ref:
S/1663/04/F
To
view the plans: Your
Energy have submitted a full Planning Application, which
is a large technical document. They have also submitted an Environmental
Statement, which constitutes as a non technical summary.
This survey can be accessed by double clicking on the link below.
The
file is a pdf file of 2.2Mb and will take several minutes to download.
This also requires a copy of Adobe Reader to display.Click
here
to
download a copy of Adobe Reader. You are advised to save the Environmental
Survey file to your hard drive for viewing off-line.
Full
plans can be viewed at either Bar Hill or Swavesey Libraries.
They can also be viewed at:
South
Cambridgeshire Hall
Cambourne Business Park
Cambourne
CB3
6EA
Between
10.00am and 4.30pm weekdays.
|